LSW Engineers Incorporated Site Map
About Services Projects Careers Contact

Projects


Tempe Kiwanis Park
Tempe, AZ

Following a report on air handling conditions, LSW designed a new system of increased capacity to replace the existing heating/ventilation systems serving the pool area. LSW also designed systems for a building addition to be used for classroom space and to provide support for the pool area rooftop ventilation. At the same time, the domestic hot water boiler serving the restroom and locker areas was replaced and thermostatic mixing valves were added for the lavatories.

Owner: City of Tempe
Size: 2,500 SF (addition)
Construction Cost: $897,000 (shell only)
Completion Date: 2000


[ Back to Top ] [ Previous Page ]



Home | About | Services | Projects | Careers | Contact | Site Map

© 2002 LSW Engineers, Inc.

Back to homepage Site Map