![]() |
![]() |
![]() |
![]() |
![]() Motorola Bipolar Facility Mesa, AZ LSW designed major remodeling and renovation projects to upgrade the facility and improve production capability. The process manufactures high-density metal oxide semiconductor (H-MOS) wafers including a photo resistant process. This process requires room space conditions of 68°F DB + 2.0° and 35% relative humidity + 5%. The following modules were included:
Other projects at the Mesa facility involved similar conditions and approximately 15 additional close/ambient control projects. One of these was MEBES work station which maintained 21°C + 0.1°C, or 69.8°F + 0.25°F. [ Back to Top ] [ Previous Page ] |
Home | About | Services | Projects | Careers | Contact | Site Map © 2002 LSW Engineers, Inc. |